Midnite Systems

Electrician website design: a page for every job you want, and your C-10 number on each one

Electrician website design is the site we plan, build and run for an electrical contractor. CSLB counts a website as advertising, so your C-10 license number goes on every page. It starts with a 15-minute call.

Who is electrician website design for?

Electrician website design is for contractors who want the site to bring in the jobs they choose. We plan and build it at three levels:

  • An owner-run shop: one or two vans, mostly homes, and an owner who still answers the phone and wants fewer calls that go nowhere.
  • A regional contractor: several crews across a few counties, homes and commercial work, and someone in the office booking estimate visits.
  • A multi-branch or national electrical company: branches in several markets, each with its own service area, crews and state license details to keep straight.

Web design for electricians in California works under two rules. The first applies to every contractor: the license number goes on the site. The second is the trade’s own: the people doing electrical work for a C-10 contractor need a state certification, and the site has to describe those certifications accurately.

Which pages does an electrician’s site need?

Good website design for electrician businesses starts from the jobs you do:

  • A page for each kind of job you want: panel upgrades and service changes, EV charger installs, troubleshooting and repairs, rewiring, lighting, and tenant improvement work if you take it. Each says what the job involves, what the customer should have ready and how the visit runs.
  • A page for the area you cover: the cities and neighborhoods you serve, with a page for a single city only where there is something true to say about it.
  • An about page: who owns the business, the C-10 number, who does the work and the certifications they hold, as you confirm them.
  • A permits page: how permits and inspections work on your jobs, in your words, with links to the building departments you deal with most.
  • A reviews page: real reviews from your customers, each linked to where it was left.
  • A request page: a short form, and a phone number that dials when it is tapped.

A contractor who also takes commercial work gets a second path: pages written for property managers and general contractors, and a form that asks for the site address, the scope and the dates.

Where does the C-10 number go on an electrician’s website?

On every page. Section 7030.5 of California’s Business and Professions Code requires every contractor’s license number in all construction contracts, subcontracts and calls for bid, and in all forms of advertising. The board’s regulation defining advertising, 16 CCR 861, includes any electronic transmission and any directory listing, and CSLB’s advertising guidelines name any website or post that solicits business on the Internet.

So your business name and C-10 number sit in the footer, where they show on every page, and again on the about page and beside the request form. The number is held in one place in the code, so a change reaches every page at once.

The rule follows your vans into the photos. For a C-10, CSLB’s guidelines say the business name and license number must be on each commercially registered vehicle, in a clearly visible place, in print of at least 72 points or letters at least ¾ of an inch high and wide. If a van appears on the home page, its lettering should match the footer.

Homeowners are told to look for it. CSLB’s advice on finding a contractor says every contractor ad, from an online ad to the name on the side of a truck, must have the state license number, and adds that seeing a number doesn’t necessarily mean the license is valid. We copy the number from your CSLB record, so the one a customer checks is the one they find.

Which electrical work can the site advertise?

Only the work your license covers. Under B&P 7027.1, advertising construction work without a valid license in the classification advertised is a misdemeanor, with a fine of $700 to $1,000. CSLB’s own example runs toward electricians: a C-29 masonry contractor cannot advertise electrical work unless it also holds a C-10.

For an electrician the question runs the other way. CSLB’s C-10 description covers placing, installing and connecting electrical wires, fixtures, appliances, apparatus, raceways, conduits and solar photovoltaic cells. A job page for work outside that, such as roofing or heating and air, waits until you hold the classification for it. When we plan the pages, each job line is checked against the licenses you list.

How should certification show on the site?

The DLSE’s electrician certification FAQs say certification is required for anyone who works as an electrician for a C-10 contractor (Labor Code 108.2). It doesn’t apply to electrical connections under 100 volt-amperes, to a sole owner with a license in their own name, or to the qualifying person; a foreman who sometimes works with the tools does need it. There are five classes, from general electrician to non-residential lighting technician. A trainee may work only under the constant supervision of a certified electrician, and a certificate expires three years from its effective date.

The claim itself is regulated. Under 8 CCR 294.0, anyone who displays a certificate or otherwise claims to be certified without being certified is barred from taking the certification test for seven years, and the DLSE adds that employers using uncertified electricians can be found in violation of Labor Code 108.2. Its FAQs also link the public lists of certified electricians and electrician trainees.

So the team page shows each person’s name, role and certification class as you confirm them. Trainees are called trainees, and nobody on the site is called certified unless the certificate says so.

What should an electrician’s request form ask?

Enough to know the job before you call back, and no more:

  • What the job is: a repair, a panel or service upgrade, an EV charger, new circuits, lighting or commercial work.
  • How urgent it is: whether the power is out or the work can be planned.
  • Where it is: the address or ZIP code, so the request reaches the right crew or branch.
  • When to call: the best time, and a photo of the panel or the problem if the customer has one.

Where you would rather book estimate visits online, the form offers only the open times you set. Each request arrives marked with the page it came from, so you can see which job pages bring in work.

How do EV charger and panel upgrade pages work?

They answer the questions customers ask before they pick up the phone, and many of those are about charging at home. The Energy Commission estimates more than 800,000 EV chargers are installed at California homes, besides 216,445 public and shared charging ports, and in August 2026 it approved a plan that puts $48 million into light-duty charging, focused on DC fast charging and at-home or near-home charging.

A charger page we would write says what the customer should have ready (the car, the charger if they have bought one, a photo of the panel), how the visit runs and who handles the permit. CSLB’s permit page says code requirements vary between cities and counties and sends homeowners to their local building department, so the page explains your process in your words and links to the departments you work with. A panel upgrade page follows the same pattern: the steps, who pulls the permit and what happens at inspection, as you describe them.

The contract backs the page up. CSLB’s page on home improvement contracts says the contract needs written direction on who will get the necessary permits and must give a date of completion, so the page and the paperwork should say the same thing.

Who writes the words on an electrician’s website?

We do, from the research and from what you tell us. Two kinds of words come from you as given: technical claims, such as loads, code sections and what a panel can carry, and anything about your license, bond, insurance or certifications. We don’t write promises about safety, results or response times, and you read every page on a private preview before anything goes live.

What is an electrician’s website built on?

Every site we make starts in our own system, coded on Astro or Next.js. We don’t build on WordPress, Shopify or Webflow, so a contractor moving off WordPress, Wix or Squarespace has its pages rebuilt in our system, with each old address redirected. The parts an electrician’s site gets in the code:

  • Electrician markup: schema.org has an Electrician type, and Google’s local business guide says to use the most specific type possible; its example for a business that offers multiple services is an array that starts with Electrician. The markup repeats the business name, phone number and service area the pages show.
  • A sitemap and IndexNow: a sitemap of the pages worth finding, plus an IndexNow ping to Bing and other engines that accept it whenever a page changes, such as a new job page.
  • AI crawlers and llms.txt: robots rules that allow AI crawlers in, and an llms.txt file with a plain-text outline of the site for the tools that read one. Google says its Search doesn’t use llms.txt, so that file serves other tools.
  • License facts held once: the business name, the C-10 number and each person’s certification are stored in one place and drawn into every page that shows them.
  • Launch guards: a page missing a fact, such as a certification you haven’t confirmed yet, is held back until the fact arrives.
  • Readable for everyone: labeled form fields, headings in order and text with enough contrast to read, checked before launch. Our page on website accessibility says more.

What happens to your current site?

The addresses your current site uses have value: customers bookmark them, suppliers or local groups may link to them, and Google has them indexed. Before launch we map each old address to its closest new page with a permanent (301) redirect, so old links and bookmarks keep working.

Your domain stays registered where it is now. We export its DNS records first, edit only the ones that send web visitors to the site, and leave the email records alone. If a lead service or directory built your current site, find out who controls the domain before the move is planned.

Will an electrician’s website show up in Google and AI answers?

No one can promise where a site will rank, and Google’s advice on hiring search help says that if someone claims their changes will put you first in search results, you should find someone else. We do not guarantee search rankings, traffic, or uninterrupted uptime.

The build decides the site itself: one page per search worth answering, titles that say what each page is, markup, and pages that load quickly on a phone. Map results also depend on things outside the site. Google’s help on local ranking names relevance, distance and popularity as the main bases for local results, and says prominence draws on things like how many websites link to a business and how many reviews it has. That work is the subject of our electrician SEO page.

Google’s page on AI features says AI Overviews and AI Mode have no additional requirements: a page must be indexed and eligible to be shown with a snippet. Search Console’s Search generative AI control, rolled out to all websites as of August 31, 2026, starts on include; excluding a site means it gets no traffic or impressions from AI Overviews, AI Mode or Discover’s generative features. What we build aims to be easy for AI answers to find, read and cite.

What does an electrician site look like in practice?

The site we can point to is Alvy Logistics’: we rebuilt it in our own system on Astro, 70 pages, and still run it with Alvy. Alvy is owned by our co-founder Noah Alvarez, and DSI is an Alvy company. Alvy is a logistics company, so its site shows how we build and makes no claim about electrical work.

What we would build for an electrician depends on the level. For an owner-run shop: a home page, a page for each job you want, an area page, an about page with the license line and a request page. For a regional contractor: the same, plus a commercial path, a page for each branch or county you work from, and job pages that link to the areas where you do that work. For a multi-branch company: pages for the markets the searches back, each built from what is really different there, such as the building departments and the crews.

What does an electrician’s website need after launch?

An electrical business keeps changing after launch. You add a service, open a branch, take on or lose a crew member, and certificates expire three years from their effective date, so the team page needs keeping current. Photos of recent jobs keep the site honest about the work you do now.

Our page on website maintenance explains the monthly work, and your proposal sets what your own plan covers. Our guide on how to choose a web design company lists more questions to put to anyone you talk to.

If you are weighing a new site, book a 15-minute call. You talk with Nicolas Perez or Noah Alvarez, our co-founders. We were formed in 2023, work from our office in Valencia, California, and work remotely with businesses across the US.

Sources

20 cited

Pricing

What electrician website design costs at each level

These are the ranges US agency price pages and guides showed for a new website at each level when we read them in October 2026. The jobs you take, the places you cover and where requests need to go decide where an electrician's site lands; your own figure comes in a proposal after the 15-minute call.

  • Level 01

    Established local business

    Market range

    $6,500 to $15,000

    Source: WebFX and DesignRush, checked October 2026

    Our ranges

    Website build
    $6,500 to $15,000
    Care plan
    $85 to $100 a month
    Hosting, DNS, SSL, security, uptime, backups and updates.
    No setup fee on a site we built.
  • Level 02

    Multi-location or regional

    Market range

    $15,000 to $50,000

    Source: WebFX, DesignRush and Lee Media Group, checked October 2026

    Our ranges

    Website build
    $15,000 to $50,000
    Care plan
    $150 to $225 a month
    All of that, plus about an hour of changes a month, a next-day reply, monthly checks and a report.
    No setup fee on a site we built.
  • Level 03

    National

    Market range

    $50,000 to $100,000

    Source: WebFX, Huemor and OuterBox, checked October 2026

    Our ranges

    Website build
    $50,000 to $100,000
    Care plan
    $350 to $500 a month
    All of that, plus up to four hours of changes a month, a four-hour reply, a named contact and a quarterly call.
    No setup fee on a site we built.

What moves the price

  • 01

    The jobs you want more of

    Each kind of job you want to win, such as panel upgrades, EV charger installs or service calls, gets a page of its own. Five job lines mean more pages to write and check than two.

  • 02

    Homes, businesses or both

    A contractor who wires houses and also takes tenant improvement work for landlords needs two paths through the site, each with its own pages and its own request form.

  • 03

    The places you cover

    A page for one city earns its place only when it says something true about working there, such as which building department issues the permit. Each one adds research and writing.

  • 04

    Where requests go

    Requests that come to your inbox by email, marked with the job type, are the simple case. If you want them in your scheduling or field service software, name it on the call and we check what it accepts before the proposal.

  • 05

    The site you have now

    Replacing a site means matching every old address to a new page and keeping the pages that still bring in calls. A large old site takes longer to map.

Market ranges from agency price pages and guides, read October 2026. Ranges, not quotes: every engagement is scoped on a 15-minute call.

The work behind it

  • Alvy Logistics

    The Alvy Logistics website: a 70-page rebuild in our own system.

  • Midnite Systems

    Formed in 2023.

  • Valencia, CA

    Our office in Valencia, CA, open Monday to Friday, 8am to 4pm.

  • The team

    Nicolas Perez, Co-Founder and CEO, and Noah Alvarez, Co-Founder and CCO.

Alvy is owned by our co-founder Noah Alvarez, and DSI is an Alvy company.

What website design for electricians includes

  • Fig 0.1

    Research

    A study of what people type when they need electrical work in the places you serve, from panel upgrades to a dead circuit, and of the contractors Google puts in front of them.

  • Fig 0.2

    A page plan

    The list of pages, one for each kind of job and each place the searches support, with the search each page answers, agreed with you before any design starts.

  • Fig 0.3

    Copy

    Every page's words, written from the research and your answers. Technical detail, such as what a panel can carry or which permits a job needs, comes from you and goes in as you give it.

  • Fig 0.4

    Design and images

    A look drawn from contractor sites that read well on a phone. Your own photos of crews, vans and finished work go in first; any AI-made image that fills a gap is logged so a real photo can replace it.

  • Fig 0.5

    The build

    Coded in our own system on Astro or Next.js, with Electrician markup, a sitemap, and your business name and C-10 number in every page's footer.

  • Fig 0.6

    Request forms

    A short form, with spam protection, that asks what the job is, where it is and when to call back, and takes a photo of the panel if you want one.

  • Fig 0.7

    Launch and measurement

    On launch day, old addresses are redirected and IndexNow is sent. From then on, Google Analytics counts form requests and taps on your phone number, while Search Console and Bing Webmaster Tools report which searches bring the site up.

  • Fig 0.8

    The monthly run

    Once the site is live it stays with us on a monthly plan; your proposal sets that plan's scope.

How it runs

How an electrician web design project runs

  1. Step 01

    A 15-minute call

    You tell us which jobs you want more of, the area you cover and what your current site brings in. We tell you plainly whether a new site would help.

    Have your C-10 number and your current site's address ready.

  2. Step 02

    A proposal

    If it's a fit, the proposal names every page, what the build costs and what happens to the site after launch.

    Read it, raise any questions, and sign off before work begins.

  3. Step 03

    Research and the page plan

    We look at what people near you search for, job by job, and plan a page for each job and place that the searches support.

    List the jobs you take and the ones you would rather not, name the cities you cover, and let us into the current site and its analytics.

  4. Step 04

    Words and design

    We write every page before designing it, put the license line in the footer and show a certification only where you confirm it.

    Send your license details, job photos, the names and certifications for the team page, and your answers on permits and service area.

  5. Step 05

    Preview and launch

    You check the finished site on a private preview, kept out of search results. At launch we point your domain at it by changing the web records, and old addresses redirect to their new pages.

    Send one list of changes, approve the launch and give us access to the domain's DNS settings.

  6. Step 06

    The monthly run

    After launch we run the site for you on a monthly plan. Your proposal sets that plan's scope.

    Tell us when you add a service, a city or a crew member, or when a license or certification changes.

Questions

Frequently asked questions

What should an electrician's website include?

A page for each kind of job you want, a page for the area you cover, an about page with your C-10 number and the people who do the work, a short request form and a phone number a customer can tap to call. Commercial work gets its own pages and form, if you take it.

Does an electrician's website need the license number?

In California, yes. Under CSLB's guidelines a website that seeks work is a form of advertising, and every ad must carry the contractor's license number, so we put yours in the footer of each page. The guidelines list a civil penalty of $100 to $1,000 for a first offense.

Can a website say our electricians are certified?

Only the ones who are. California requires certification for anyone working as an electrician for a C-10 contractor, and under 8 CCR 294.0 a person who claims to be certified without being so is barred from taking the test for seven years. The team page shows each certification as you confirm it.

Can an electrical contractor's website mention its bond and insurance?

With care. B&P 7027.4 makes it cause for discipline to advertise insurance without naming the type, such as commercial general liability or workers' compensation insurance, and to advertise as bonded when the bond meant is the license bond. The site names the coverage you hold, from your certificate.

Can a request form send jobs into scheduling software?

Each request comes to your inbox by email, marked with the job type and the page that sent it. Whether it can also land in your scheduling or field service software depends on what that software accepts, so name it on the call and we check before the proposal.

How do I choose who builds an electrician's website?

Ask to see sites they have built and still run, who keeps the domain and how old addresses get redirected. Google's advice on hiring search help says a redesign is a great time to bring that help in, the earlier the better, so the new site is search-friendly from the bottom up.

Talk with a co-founder

Book a 15‑minute call